Blog

What a website should cost — and what you are actually paying for

The same brief gets quoted at five thousand and fifty thousand, and both studios can be honest about it. Where the money goes, which line items are usually padding, and what to cut when the budget will not move.

Ask five studios to build the same site and the quotes will land an order of magnitude apart. That spread is not fraud and it is not incompetence. It is the absence of a shared definition: “a website” describes an outcome about as precisely as “a vehicle” describes a purchase.

So here is the breakdown that usually stays inside the studio.

Why one brief becomes five different prices

Before the numbers, the reason they diverge. Every studio reading your brief silently fills in the blanks, and they fill them in differently.

None of these makes a studio dishonest. It makes the totals incomparable until you force the assumptions into the open, which is the single most valuable hour you will spend on procurement.

Where the money actually goes

On a custom project that goes well, the budget splits roughly like this:

Now look at what is invisible in that list. The first item and the last two — roughly a third of the budget — produce nothing you can screenshot. That is precisely where cheap quotes get cheap. Nobody advertises “we removed the testing”; they simply quote a number that cannot contain it.

What you are buying, by shape

Pages are a poor unit. Twenty pages of the same template cost less than one page with a configurator on it. The useful bands are defined by what the thing has to do:

Which band you are in moves the price far more than page count, and any studio should be able to place you during a first conversation. If they cannot, they are pricing pages.

The three line items that are usually padding

The four things that genuinely move the price

What to cut when the budget will not move

In this order, and we will say it out loud in a first call: page count first, then custom illustration and photography, then animation and polish, then flexibility in the content system — fewer editable areas, more decisions made once and fixed.

What we will argue about rather than cut: testing, analytics and the handover. Cutting testing does not remove the defects, it moves them to your customers, who report them by leaving. Cutting analytics means you will never learn whether any of this worked, which turns the whole purchase into an act of faith. Cutting the handover means paying somebody forever for access to your own website.

When we tell people not to hire us

If a budget covers the build and nothing else — no content, no photography, nothing left to bring anybody to the site — then a good template plus that spending beats a custom site nobody visits. We have given that advice more than once. It costs us the project and saves the client a year. A beautiful site with no traffic and no product photos is an expensive way to discover what your actual problem was.

The same logic runs the other way. If the site is already earning and the complaint is “it feels dated”, the money often belongs in three targeted fixes rather than a rebuild — we made the whole argument for not rebuilding elsewhere, and it costs us bigger projects than this one does.

What a studio should ask before it quotes anything

A price that arrives without questions is a guess wearing a suit. Before quoting, anybody serious needs to know what the site is supposed to change in your business, who signs off, what content exists today, which systems it has to talk to, and what your real deadline is driven by — a season, a trade show, a contract, or a preference.

If a quote arrives without those five answers, one of two things is true: the studio has priced a generic project and will discover yours later, or it has quietly padded the number to survive whatever it finds. Both are expensive, and the second one is expensive even when nothing goes wrong.

The number that actually decides this

The right budget is not the market average. It is your own arithmetic: what should this site add over the next twelve to eighteen months — orders, qualified leads, hours removed from someone's week — and what is that worth in money? A site expected to add fifty thousand in margin justifies a different number than one expected to add five, and neither number appears in anybody's price list.

Once you have it, ask each studio two things: which band they think you are in, and what their day rate is. Two studios with the same day rate quoting very different totals are describing different amounts of work — and now you can ask exactly which work one of them left out.